Bid/RFP Status: 
Open - accepting bids and proposals
Bid/RFP Due Date: 
Monday, September 16, 2024 - 2:00pm

The Project consists of furnishing all materials, labor, equipment, and supervision for construction for comprehensive replacement, maintenance, and repairs to the City of Wilsonville’s three (3) water feature systems over a period of at least five (5) years. This contract is for needed future and ongoing upgrades, maintenance, and repairs related to the City’s three water feature systems located in Murase Plaza (2) and Town Center Park (1). The contract will be a five-year contract with opportunities to extend further if desired by the City. Any performance of additional and incidental work as called for by the Specifications and Contract Documents.

The Work consists of improvements and ongoing maintenance at two separate locations: Murase Plaza at Memorial Park, and Town Center Park.

The estimated Project cost range is $250,000 - $350,000.