Villebois - Carvalho and Seville Row Houses

Carvalho Row Houses

Carvalho Image

Seville Row Houses

Seville Image
This project consists of 25 lots of detached Row Houses in the Villebois Village Center.   These row houses continue the placement of row homes on important walking streets, transitioning from neighborhoods to the south and east of SAP South to the neighborhood within the Village Center surrounding the Plaza.  The Preliminary Development Plan (PDP) for the Phase 1 area of SAP Central was broken into two areas for their Final Development Plans (FDP):

  • Carvalho is located along SW Villebois Drive South, between SW Zurich Street and SW Barber Street, and includes lots 91-108 of Villeobis Village Center #1.
  • Seville is located on the north side of Barber Street immediately west of Ravenna Loop and includes the development of 7 detached row houses 
These approvals are modifications to the 2006 approvals for PDP 1 Central. 

Staff Contacts


Staff can be reached via telephone at 503-682-4960
Project Information
  • Property Owners:  RCS - Villebois Investments, LLC
  • Applicant:  JT Roth Construction
  • Design Team Coordinator:  Mark Stewart, Home Designs
  • Contractor:  Northwest Earthmovers, Inc.

Project Status


  • Planning Approvals:  See below under Planning.
  • Construction Status:  Roadway infrastructure completed.  Home construction is ongoing.
Building:
‚Äč
Engineering:

Public utilities are in.
Planning:

On September 8, 2014, the Development Review Board Panel A (DRB A) approved The PDP 1C modification, SAP Refinement, Tentative Subdivision Re-plat and a refinement to the Village Center Architectural Standards for the LInear Green Address as specified in the adopted Staff Report.  Documents that were submitted for the DRB public hearing included:


On February 9, 2015, the DRB A approved the FDP for the Carvalho Row Houses as specified in the adopted staff report.  Documents submitted for the DRB hearing included:


On February 9, 2015, the DRB A approved the FDP for the Seville Row Houses as specified in the adopted staff report.  Document submitted for the DRB hearing included: