Kinsman Road Extension

Kinsman Road Alignment
This project will extend Kinsman Road north of Barber Street to Boeckman Road, improving the Wilsonville roadway grid system west of I-5.  The project includes bike lane facilities and sidewalks along Kinsman Road, a multi-use pathway along the Coffee Creek wetlands, wildlife crossings and a roundabout intersection at Boeckman Road.  As part of the project, an upsized 30" sanitary sewer pipe will be installed with the roadway alignment to serve future development of Basalt Creek and Coffee Creek areas.  The Willamette Water Supply Program, a partnership between Tualatin Valley Water District and the City of Hillsboro to provide additional regional water supply by 2026 utilizing the mid-Willamette River, will be constructing a 66" water pipeline with the roadway improvements.

Staff Contacts

  • Staff can be reached by calling 503-682-4960.
  • Zach Weigel Civil Engineer

Project Information

  • Design Engineer: OBEC Consulting Engineers
  • Contractor: Emery & Sons
  • Funding Source: Street SDC and Federal Grant Funds
  • Capital Improvement Project #: 4004

Project Status

  • Construction began on July 11, 2016 and will take two (2) years to complete.